The Prodigal Altar Boy

Saturday, October 8, 2011

2011 last 100 days

2011 last 100 days
Countdown:
83 Days Left
Day: 17
8 October 2011
  • Goal - 1 hour per day doing some work on the movie:

Watced module #6 Karen Everett video:



   The Stages of Post-Production (how the pros do it)

   Best Practices for the Director/Editor Collaboration

   Tips for Holding a Rough Cut Screening

  • Goal:  30 minutes per day basic music work:

Details:  
Electric warm ups on the Roland Strat
Miles Davis - “So What”
Living Colour - “Talkin’ Loud and Sayin’ Nothing”
Total time:  30 minutes

  • Goal:  15 minutes per day (minimum) exercise:

Active Stretching
Total time:  15 minutes
   
    • Goal:  15 minutes per day (minimum) scoring work for the movie:

Details:  Worked on Dies Irae. (Roland Strat) focused  on the octave and dyad climbs.
“Granby Street” - Worked on lyrics and rhythm guitar work
R&B Chord progression work.
Worked on the E - B/D# - C#m - A chord progression
D-sus riff work
A Dorian Intervallic riff work
Total time:  15 minutes